Lean Change Element
Measurements
The people affected by the change have created their own measurements that align to the objectives of the change

Measurements vs traditional thinking
Two different assumptions about how change should work.
Lean Change
A balance of measurements and diagnostics are needed and we shouldn't commit to detailed measurements too early.
Traditional Change Management
We can't start the change without details "from - to" measurements otherwise we won't know if what we've done has worked.
Ah measurements.
There are plenty of perspectives on what makes a good measurement, but no one has cracked the code on which ones are best.
Member view
Members see the deeper working notes
Sign in to read the full detailed content, relationship notes, and the richer context around how this element is applied.
Connections to the broader Lean Change ecosystem.
Stuckthis leads toward
BIG/NEXT/NOWStuckthis is connected from
Celebrate SuccessStancethis leads toward
DiagnosticsToolthis is connected from
ExperimentationToolthis leads toward
Pirate MetricsToolthis is connected from
Pirate MetricsMembers only
Sign in to see curated resources, tools, and deeper ecosystem connections for this element.
Join / sign in →